Skip to content
Evova

Home Charging

EV Charger for Flat Owners: Grants, Consent and Wiring (2026)

Installing an EV charger at a flat in 2026: the £500 grant, freeholder consent, allocated parking, metering options and what leaseholders can actually do.

By Evova · Published

Illustration of one lit allocated parking bay with an EV charger outside a brick block of flats at dusk

Yes — flat owners can install an EV charger, and you’re one of the main groups the government grant is aimed at. You’ll need three things: a designated, private parking space you’re legally entitled to use, written permission from your freeholder or management company, and an OZEV-authorised installer. The EV Chargepoint Grant covers 75% of the supply-and-install cost, up to £500 per socket (raised from £350 on 1 April 2026), funded until at least 31 March 2027. The real hurdle usually isn’t money: there’s no legal right to charge in the UK, so everything hinges on your building saying yes.

Who qualifies for the £500 grant

The grant is open to people who own and live in a flat (including shared ownership) or rent a residential property. Owner-occupiers of houses generally can’t apply — the scheme targets people without a driveway of their own.

Beyond tenure, three conditions matter:

  • Designated, private off-street parking that you own or have the legal right to use, accessible to you at all times. It doesn’t have to be next to your flat — a bay across the car park qualifies.
  • An eligible vehicle on the OZEV-approved list — as registered keeper, through a lease or work-vehicle arrangement (broadly, six months or longer), or one on order.
  • Written permissions in place before you apply. OZEV asks for proof of all legal rights and permissions — including freeholder or landlord consent — with your application.

Since 1 April 2026 the scheme has run on a new application platform: you apply yourself, attaching a quote from an OZEV-authorised installer, and must not have the charger installed until OZEV confirms your application. Your installer then fits the unit, deducts the grant from the final invoice and claims the money back — OZEV pays the installer, never you.

Here’s the honest bit: there is no statutory right to charge in the UK, and campaigners’ calls for a legal “right to request” haven’t yet made it into law. Your freeholder is under no obligation to say yes.

Your lease still matters. If your parking space is demised — actually included in your lease — and the lease requires the freeholder’s consent for improvements, that consent generally can’t be unreasonably withheld (section 19(2) of the Landlord and Tenant Act 1927). The snag is the cable: it almost always has to cross communal land to reach your bay, and there the freeholder has much freer rein to refuse. What you can insist on depends on your lease’s wording — one for a solicitor who knows leasehold work.

Consent is normally formalised through a licence to alter, setting conditions on the charger model, its position and the cable route — expect legal and surveyor fees on top of the install. A clear, professional proposal from a competent installer genuinely helps your case.

One bright spot: under Part S of the Building Regulations, new residential buildings in England with associated parking have had to include a chargepoint per dwelling since 15 June 2022 — so consent battles are largely an older-block problem.

Your own meter, or the building’s supply?

The cleanest setup runs the charger from your own meter, so every kWh goes through your own tariff — ideally a cheap overnight one (see our home charging hub). Practicality comes down to distance: a long run from meter cupboard to bay means cable, trunking and groundworks — that’s where the money goes.

Where your own supply can’t sensibly reach, some blocks wire chargers from the communal (landlord’s) supply, with usage metered and billed back through the management company. That needs the freeholder actively involved, so it suits blocks planning charging for several residents at once.

Either way, the installer must notify your electricity network operator (DNO). Within the standard demand limit (broadly 60A per phase) they can connect first and notify within 28 days; above that, or with a supply issue such as a looped supply, the DNO must approve first. The installer you choose will check your supply and consumer unit as part of the quote. And resist the extension-lead-from-a-window shortcut: proper chargers are built for outdoor life with weatherproof IP ratings (compare models on our charger pages); trailing cables across communal ground is a hazard any managing agent will shut down.

Costs, and the grants for the whole block

Evova doesn’t price jobs — only a quote can — but as a rough market picture, a straightforward fully installed 7kW chargepoint commonly comes in around £800–£1,200, with complex jobs (long runs, groundworks, consumer-unit work) costing considerably more. Flat installs land in that second group more often than houses, purely because of meter-to-bay distance. A straightforward job completes in a single 2-4 hour visit; the grant then takes up to £500 off your invoice.

Grant routeWorthStatus
Flats and renters grant75%, up to £500 per socketOpen; funded to 31 March 2027
Residential landlord grantUp to £500 per socket, up to 200 socketsOpen; landlords, management companies, social housing providers
On-street parking grantUp to £500, with a cross-pavement solutionOpen — for households with on-street parking only
Residential landlord infrastructure grantWas up to £30,000 per buildingClosed to new applications 31 March 2026

Last checked July 2026 against GOV.UK.

For block-wide charging, note the infrastructure grant that funded building-wide wiring is closed — only the per-socket landlord grant remains; our grants hub tracks the live routes. When you’re ready for numbers, compare OZEV-authorised installers near you or request a free quote — a good installer will have handled leasehold consents before and can supply the technical detail a licence to alter demands.

Grant rules move quickly — cap, closing dates and application platform have all changed within the past year — so verify the current position on GOV.UK before you commit.

Frequently asked questions

Can I install an EV charger if I own a flat?
Often, yes — provided you have a designated private parking space you are legally entitled to use, and your freeholder or management company gives written permission. Flat owners are one of the main groups the EV Chargepoint Grant targets, worth up to £500 off supply and installation (as of July 2026). The install itself is standard work for an OZEV-authorised installer; the permissions are usually the harder part.
Do I need my freeholder's permission to install an EV charger?
In practice, yes — always. Even if your parking space is demised in your lease, the cable route almost always crosses communal land, and permission for that is at the freeholder's discretion. Consent is normally formalised through a licence to alter, and OZEV requires proof of all third-party permissions before the grant application is made.
Is there a legal right to charge for flat owners in the UK?
No. There is currently no statutory right to charge, so landlords and freeholders are under no legal obligation to allow an EV charger. Campaign groups have been pushing for a legal right for tenants and leaseholders to request charging, but as of July 2026 no such right exists in law.
How much is the EV charger grant for flats in 2026?
The EV Chargepoint Grant covers 75% of the cost of buying and installing a chargepoint, capped at £500 per socket — the cap rose from £350 on 1 April 2026, and funding runs until at least 31 March 2027. You apply as the customer on the government's platform, but the grant is deducted from your invoice and claimed by your OZEV-authorised installer.
Can my EV charger run from my flat's own electricity meter?
Usually that is the preferred setup, because every unit of charging goes through your own tariff. Practicality depends on the distance between your meter and your parking space — long cable runs through communal areas push the price up and need freeholder consent for the route. Where that isn't feasible, some blocks run chargers from the communal supply with billing handled by the management company.

Ready for a free, no-obligation quote?

Tell us what you need and we'll pass your enquiry to one local installer. Free, with no pressure to proceed.

Get a free quote
Evova quick quote bar