EV Charger Installation Certificates and Paperwork Explained

What an EV charger installation certificate is, the Part P, DNO and warranty paperwork a compliant install leaves behind, and how to chase missing documents.

By Evova · Published

Illustration of five sealed certificates fanned on a hall table with an EV charger visible through the door

A compliant home EV charger installation should leave you with five documents: an Electrical Installation Certificate (EIC), a Building Regulations compliance certificate, confirmation that your DNO (electricity network operator) was notified, the charger’s statement of compliance, and warranty documents for both the unit and the workmanship. The install itself typically completes in a single 2-4 hour visit — but the paperwork trail runs for weeks afterwards, and it matters when you sell the house, claim on insurance or use a grant.

The paperwork checklist

DocumentWho provides itWhen to expect itWhat it proves
Electrical Installation Certificate (EIC)Your installerOn or shortly after install dayThe new circuit was designed, installed and tested to BS 7671
Building Regulations compliance certificateThe installer’s scheme (NICEIC, NAPIT etc.)Within roughly 30 daysThe work was notified under Part P
DNO notification referenceYour installer — ask for a copyWithin 28 days of the installYour network operator knows the charger exists
Statement of complianceThe charger’s seller or manufacturerWith the chargerThe unit meets the 2021 smart charging regulations
Warranty documents (charger + workmanship)Manufacturer and installerAt handoverWho fixes what, and for how long
Grant confirmation and landlord permission (if applicable)You and your installerBefore and after installYour grant claim record

Timescales last checked July 2026 against scheme and Energy Networks Association rules.

The EIC and the Part P certificate

The EIC is the model form from BS 7671 (the IET Wiring Regulations) certifying that a new circuit — and a home charger always means a new dedicated circuit — was designed, installed and tested to the standard. The electrician who did the work issues it directly, usually on install day.

Adding that circuit is also notifiable work under Part P of the Building Regulations in England and Wales. An electrician registered with a competent person scheme can self-certify rather than involving council building control, and the scheme then sends you the Building Regulations compliance certificate. NAPIT installers, for example, must notify the work within 21 days, and the certificate should normally be with you within 30 days of completion. If a month passes and nothing arrives, chase it.

Watch out: a branded “EV charging point installation certificate” from the installer is a nice extra, not a substitute for the EIC or the scheme certificate.

DNO notification and the smart charging statement

Your installer handles the DNO. Where the property’s maximum demand including the charger stays within 60A per phase, the charger can be fitted first and the DNO notified within 28 days; above that, the installer generally needs the DNO involved before the charger goes live — prior approval or load-limiting kit. The installer you choose will check your supply and consumer unit as part of the quote, and that check decides which route applies. There’s no standard homeowner certificate for this, so ask your installer for the notification reference for your records.

Separately, under the Electric Vehicles (Smart Charge Points) Regulations 2021, every home charger must be sold with a statement of compliance identifying the model and the seller. Keep it — it’s your proof the unit legally meets the smart charging rules.

Why the paperwork matters

Selling the house. The Law Society’s TA6 Property Information Form (6th edition, mandatory since 30 March 2026) asks sellers to disclose electrical work and supply the certificates. For notifiable work done since January 2005, buyers’ solicitors expect the Building Regulations certificate or the EIC. Missing paperwork usually means delays, indemnity insurance or a price chip.

Insurance. Insurers can ask for evidence that electrical work was carried out by a qualified person. The EIC and scheme certificate are exactly that evidence.

Grants. Since 1 April 2026 the renters/flat-owners and landlord grants run on a new GOV.UK platform: you start the application yourself, but your OZEV-authorised installer claims the grant on your behalf after the install, submitting photos of the installation and an invoice showing the grant deducted. Renters also need their landlord’s written permission — file it with everything else. The grant is worth up to £500 per socket (raised from £350 on 1 April 2026), covering 75% of the supply and install cost, with funding confirmed until at least 31 March 2027. Full details on our grants hub.

Warranties. You should hold two: the manufacturer’s warranty on the charger — typically 3 years for mainstream units, though Simpson & Partners covers its enclosure for 10 — and a separate workmanship warranty from the installer. Neither has a mandated minimum length, so get both in writing.

If the paperwork never arrives

Chase the installer in writing first. If that fails, go to their scheme: NICEIC or NAPIT hold the notification record — not the installer alone — and can confirm whether the work was notified and issue a replacement certificate, usually for a small fee. The same route works if you’ve simply lost yours.

If the work was never notified at all, the fix is harder. Another electrician cannot issue an EIC retrospectively — the best they can offer is an EICR (a condition report). The formal remedy is applying to your local authority for regularisation: a retrospective certificate at a higher fee, usually requiring an inspection, and councils may — but aren’t obliged to — grant it. The cheaper path is prevention: ask at quote stage which scheme the installer belongs to and confirm the certificates are included before paying the final invoice. When you find an installer through our directory or request a free quote, that’s a fair and normal question to put to them.

Scheme rules and grant amounts change from time to time — check GOV.UK’s chargepoint grant pages for the current position, and take notification questions to the installer’s scheme or your local authority’s building control team.

Frequently asked questions

What paperwork should I get after an EV charger installation?
A compliant install should leave you with an Electrical Installation Certificate from the installer, a Building Regulations compliance certificate from their competent person scheme, a DNO notification reference, the charger's statement of compliance, and warranty documents for both the unit and the workmanship. If you used the EV chargepoint grant, keep your application confirmation and any landlord permission letter with the rest.
How long should the Building Regulations compliance certificate take to arrive?
Usually within about a month. Scheme rules work to tight windows — NAPIT installers, for example, must notify the work within 21 days so NAPIT can issue the certificate and inform the local authority, and industry practice is for the certificate to be issued within 30 days of completion. If nothing has arrived after a month, chase the installer, then contact the scheme directly.
What is the difference between an EIC and an EICR?
An Electrical Installation Certificate (EIC) certifies new work — such as a dedicated EV charging circuit — at the time it is designed, installed and tested. An EICR is a condition report on an existing installation, carried out later by any qualified electrician. An EICR can support a regularisation application, but it is not a retrospective EIC and no other electrician can issue an EIC for work they did not do.
Can I sell my house without an EV charger installation certificate?
You can, but expect friction. The Law Society's TA6 form asks sellers to disclose electrical work and provide supporting certificates, and buyers' solicitors typically expect either the Building Regulations compliance certificate or the electrician's EIC for notifiable work done since January 2005. Missing paperwork often ends in indemnity insurance, a regularisation application or a renegotiated price — your conveyancer can advise on the least painful route.
My installer never gave me a certificate — what can I do?
Chase the installer in writing first, then contact their competent person scheme — NICEIC or NAPIT hold the notification record and can confirm whether the work was notified and supply a copy or replacement certificate, usually for a small fee. If the work was never notified at all, the formal remedy is applying to your local authority for regularisation, which costs more and usually requires an inspection.